Johnson Controls

Description
AMS Ltd was appointed by JCI to provide a turnkey solution to increase the power availability at their EMEA Data Centre, which was at full capacity.

AMS Ltd’s innovative design saw both increased resilience and capacity for the client within their programme with no impact to existing services. Total power was doubled to 2MVA and IT power increased initially via a modular, high-efficiency UPS system from 600kVA to 900kVA. A bespoke 2.2MVA SBG was installed to supplement the existing and provide N+1 resilience to the site. The modular UPS design allowed the client to meet their initial requirements in the programmed time and finally increase their total IT capacity to 1.2MVA. High efficiency, free cooling chillers and environment controls supplemented the existing free cooling system.

AMS Ltd was not only able to provide JCI with their increased capacity but also increased resilience and increased efficiency all within programme and budget.

Services Provided
SPOF survey, project management, turnkey M&E solution

Location(s)
Burscheid, Germany

Programme

Phase 1 Power: 10 Weeks. Phase 2: 12 weeks